January 14

The accumulated generation of Three Gorges Hydropower Plant reached 900 TWh.

March 31

The signing ceremony of Chuanyun Company shareholding rights transfer to CYPC was held in Chengdu, which marked the successful completion of assets securitization of Xiluodu and Xiangjiaba Hydropower Plants of CTG, namely the major assets restructuring of CYPC.

June 7

The accumulated generation of Gezhouba Hydropower Plant reached over 500 TWh.

August 8

CYPC contributed 10 million Chinese Yuan to the flood-stricken areas of Hubei Province in support of the flood-fighting, relief-provision and post-disaster construction work.

August 22

CYPC issued an announcement that it had purchased 30% equity from BCP Meer wind Luxembourg S.à.r.l. in the name of its wholly-owned subsidiary, China Yangtze Power International (Hong Kong) Co., Ltd. (CYPI).

August 29

The accumulated generation of Xiangjiaba Hydropower Plant reached 100 TWh.

November 2

CYPC successfully issued double-currency exchangeable bonds of 300 million US dollars and 200 million Euros in Hong Kong.

December 31

The cascaded hydropower plants generated 206.060 TWh, of which, Three Gorges Hydropower Plant accounted for 93.533 TWh, Gezhouba Hydropower Plant 18.299 TWh, Xiangjiaba Hydropower Plant 33.225 TWh, and Xiluodu Hydropower Plant 61.003 TWh.